BIM-Enabled Coordination and 5D Cost Estimation of Alternative Walling Systems for a Mixed-Use Building in Yaoundé, Cameroon. (2026). Journal of Advanced Multidisciplinary Studies (JAMS), 1(2), Page 387-402. https://doi.org/10.68050/JAMS.2026.338